Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the jig_td domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6121
Balwyn Multi-Unit - Converge Building

New Build

Balwyn Multi- Unit Build 

With a large property located in the heart of Balwyn, the client’s brief was to have two separate dwellings constructed whilst not compromising on potential usability. The core drive for the build was to create two homes that provided a sense of luxury whilst maintaining practicality and functionality. Focused on a more classical design orientation the clients have selected materials and products to consistently create the sense of elegant classical design throughout.

 

Let's Move Your Project Forward

Contact us today build your vision.

info@convergebuilding.com.au
PH: 0408 999 699